Ad Spot

Fire station project on schedule

By By Thomas Tingle
Record Managing Editor
Madison City Engineer Jo Somers said construction of Madison's third fire station on County Line Road is on schedule and will open next spring.
Huntsville-based Lee Builders is building the new fire station. The Madison City Council awarded the contract to Lee Builders after approving its bid of $576,925.
Chris Sides of Mouzon &Associates, the architectural firm who designed the fire station, said it would take between eight to nine months to build the new fire station.
"Fire Station No. 3 will contain 5,400 square feet of space with two engine bays upon its completion," Sides said.
Susan Klopfenstein, construction contracts manager for the city of Madison, said interior fixtures for the new fire station are now being chosen.
"We couldn't be more pleased with the progress being made at the construction site," Klopfenstein said. "Since the beginning, the project has run smoothly. We look forward to getting this new fire station completed and in operation."
The land on which the fire station is being built was donated by Heritage Plantation Inc and is the first new fire station to be built since 1996. Sides said the fire station will be a single-story structure and will contain a living space with four bedrooms – including a guest bedroom, kitchen, dining room area and bathrooms.
"Since this station will be located next to residential dwellings, we took that in mind and designed this building with a more "homier" feel to it," Sides said. "It will fit well into the existing surroundings.
Fire Station No. 1 is located at the intersection of Hughes Road and Mill Road. Fire Station No. 2 is located on Hughes Road across the street from Discovery Middle School. Each of those fire stations contains two engine bays.
Two new fire engines have been ordered for the department and will be delivered to Madison next January. One of the new engines will be stationed at Fire Station No. 1. The second new engine will replace an existing reserve engine at either Fire Station No. 1 or No. 2.

Madison

City urges caution as paving progresses on Hughes Road

Bob Jones High School

Madison City Chess League forms new group for adults

Madison

Madison City Schools named best Alabama school district

Madison

Mercy Wolverton impressively masters hi-tech study, business

Madison

At Madison Street Festival, veterans to show fighter helicopter from Vietnam War

Madison

Local marching bands to be featured at “March on Madison” tonight

Madison

MSF’s Community Showcase promises array of talent

Madison

Brooms, mops in Lions Club sale to raise funds for vision projects

Harvest

Local musicians to jam at Madison Street Festival

Madison

Trash Pandas fall 4-2, Tennessee evens series

FRONT PAGE FEATURED

Athletic Hall Of Fame Accepting Nominations

Harvest

Railyard BBQ Brawl and Music Festival returns Oct. 29

Bob Jones High School

Tommy Overcash appointed to Madison Board of Education

Madison

Children vulnerable for troubled mental health, Cook says

Madison

Fast start leads Trash Pandas to 9-5 in playoff game 1 win

Harvest

Updating state’s 1901 Constitution on November ballot

James Clemens High School

Boynton champions languages with ‘A Seal of Biliteracy’

Madison

Jessica Penot to discuss ‘Haunted North Alabama’

Madison

MSF shows artistic influences at Artist Alley, Crafters Cove and Student Art Tent

Bob Jones High School

Bob Jones, James Clemens command National Merit totals for Alabama

Bob Jones High School

Coaches White and McGehee speak in ‘Sittin’ With the Supe’

Huntsville

Dr. Charles L. Karr named President of UAH

Madison

Trash Pandas clinch second half title with 5-2 win, playoffs start next week

Harvest

Master Gardeners set for Fall Plant Sale on Sept. 24

x