Ad Spot

Architect, contractor propose five phases for Bob Jones reno

(RECORD PHOTO/JOHN ALLEN)
(RECORD PHOTO/JOHN ALLEN)

MADISON – Proposed renovations of Bob Jones High School would improve pedestrian traffic, add classrooms and update infrastructure at a price tag of $36 million, if all five phases were completed.

At its July 27 meeting, Madison Board of Education heard a preliminary presentation from Frank Nola Jr. with Nola|Van Peursem Architects and Kevin Gunnison with Volkert Inc.

Phase 1 would renovate the upper floor with a “welcome center” concept for the entrance and reconfigured administrative and counseling offices. The media center would have extensive upgrades to accommodate electronic media.

One of the most sweeping changes, an alternate circulation or wide concourse would connect the main building through the courtyard to the cafeteria area. “Phase 1 will address the central core area and improve security at the entrance,” Nola said.

Phase I includes 43,000 square feet in renovations and 8,000 square feet in additions. Construction would require placement up to 30 mobile classrooms or a “learning village.”

Phase 1’s cost would be $10,850,000, which includes $400,000 for portables and $1 million for infrastructure improvements, including sprinkler systems. Phase 1’s proposed start date is June 1, 2014 and would require 12 months of work.

Phase II would reconfigure the north wing as a Science, Technology, Engineering and Mathematics (STEM) Academy and “completely rebuild science labs … and keep them in business” during construction, Nola said. Renovations cover 37,000 square feet at $2,775,000 and $150,000 for portables, again requiring about 12 months.

Phase III, a “summer project” during three months, would remodel north and south classroom wings and improve special-needs facilities. The price tag is $5,430,000.

Phase IV reconfigures the auditorium from 1,200 to 800 seats with an open “breakout” lobby area for $4,053,000.

Phase V, which Nola called “an audacious expansion,” would add a coliseum-style competition gym, field house and career technology wing. The practice gym would become high-bay areas for visual arts and ROTC. Phase V would require $12,590,000.

The board of education will study and debate the proposal in upcoming months.

Madison

Madison City Schools named best Alabama school district

Madison

Mercy Wolverton impressively masters hi-tech study, business

Madison

At Madison Street Festival, veterans to show fighter helicopter from Vietnam War

Madison

Local marching bands to be featured at “March on Madison” tonight

Madison

MSF’s Community Showcase promises array of talent

Madison

Brooms, mops in Lions Club sale to raise funds for vision projects

Harvest

Local musicians to jam at Madison Street Festival

Madison

Trash Pandas fall 4-2, Tennessee evens series

FRONT PAGE FEATURED

Athletic Hall Of Fame Accepting Nominations

Harvest

Railyard BBQ Brawl and Music Festival returns Oct. 29

Bob Jones High School

Tommy Overcash appointed to Madison Board of Education

Madison

Children vulnerable for troubled mental health, Cook says

Madison

Fast start leads Trash Pandas to 9-5 in playoff game 1 win

Harvest

Updating state’s 1901 Constitution on November ballot

James Clemens High School

Boynton champions languages with ‘A Seal of Biliteracy’

Madison

Jessica Penot to discuss ‘Haunted North Alabama’

Madison

MSF shows artistic influences at Artist Alley, Crafters Cove and Student Art Tent

Bob Jones High School

Bob Jones, James Clemens command National Merit totals for Alabama

Bob Jones High School

Coaches White and McGehee speak in ‘Sittin’ With the Supe’

Huntsville

Dr. Charles L. Karr named President of UAH

Madison

Trash Pandas clinch second half title with 5-2 win, playoffs start next week

Harvest

Master Gardeners set for Fall Plant Sale on Sept. 24

Madison

Senior center conducts food drive, ceramics sale

Madison

MSF doubles Children’s Area, changes shuttle stops

x